GreenGrid

AD

Live operations

Energy Monitoring

Track real-time load, facility consumption, and peak-demand events from connected meters.

Live data
3.8%

Current load

832.4 kW

Across 4 facilities

Peak demand

1,124 kW

Recorded at 14:32

1.2%

Power factor

0.94

Optimal operating range

High-load events

02

Requires attention

Usage trend

Live consumption and renewable contribution

Facility consumption

Current load distribution

FacilityCurrent loadShareStatus

Main Office

Block A

284.6 kW
36%
Normal

Manufacturing

Plant 01

248.2 kW
31%
High

Data Centre

Block C

176.4 kW
22%
Normal

Warehouse

North Wing

88.1 kW
11%
Efficient
Loading GreenGrid